Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Mirzapur: The Movie Unveils First Look Posters
    • Alka Yagnik Shares Health Update After Padma Bhushan Honour
    • South Africa Shock South Korea To Reach Last 32
    • Neymar Returns As Brazil Seal Group Top Spot
    • Ronaldo Open To Dream World Cup Clash With Messi
    • England Reach T20 World Cup Semi-Finals
    • Madibo Handed Five-Match Ban After Kone Injury
    • TATA AIG Introduces MediCare Reserve
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Railways Gears Up For Nashik Simhastha 2027 With ₹1,011 Cr Upgrade Plan

    Railways Gears Up For Nashik Simhastha 2027 With ₹1,011 Cr Upgrade Plan

    0
    By Aruna Sharma on July 26, 2025 CRIME

    In preparation for the Nashik-Trimbakeshwar Simhastha 2027, the Ministry of Railways has initiated advance planning, building on insights from the Prayagraj Maha Kumbh 2025. Union Railway Minister Shri Ashwini Vaishnaw and MoS Shri Ravneet Singh Bittu reviewed project plans alongside senior officials.

    Key Highlights:

    • Enhanced Connectivity: 5 major stations — Nashik Road, Devlali, Odha, Kherwadi, and Kasbe Sukene — will manage the expected 3 crore pilgrims.

    • Infrastructure Boost: ₹1,011 crore allocated for 65 works (33 already sanctioned), including platforms, foot overbridges, stabling lines, and passenger amenities.

    • Special Train Services: Long-distance and MEMU trains to operate from major cities; a special Jyotirlinga circuit train to run.

    • Crowd Management: Large holding areas, AI-powered scheduling, and CCTV-monitored control centers for real-time coordination.

    • Centre-State Collaboration: Regular coordination with Maharashtra government; a joint review with CM Shri Devendra Fadnavis is scheduled.

    Railways aims to complete the works within 2 years, ensuring smooth, safe, and comfortable pilgrim movement for Simhastha 2027.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    UP Teen Held For Killing Brother’s Family

    Actor James Handy Found Dead In California

    Delhi Police Bust Terror Module, Arrest Eight

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    June 25, 2026

    Mirzapur: The Movie Unveils First Look Posters

    June 25, 2026

    Alka Yagnik Shares Health Update After Padma Bhushan Honour

    June 25, 2026

    South Africa Shock South Korea To Reach Last 32

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    June 25, 2026

    South Africa Shock South Korea To Reach Last 32

    June 25, 2026

    Neymar Returns As Brazil Seal Group Top Spot

    June 25, 2026

    Ronaldo Open To Dream World Cup Clash With Messi

    Company
    Company
    Recent Posts
    • Mirzapur: The Movie Unveils First Look Posters
    • Alka Yagnik Shares Health Update After Padma Bhushan Honour
    • South Africa Shock South Korea To Reach Last 32
    • Neymar Returns As Brazil Seal Group Top Spot
    • Ronaldo Open To Dream World Cup Clash With Messi
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.