Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Water Hyacinth Spreads Across Gomti, Clean-Up Drive Begins Today

    Water Hyacinth Spreads Across Gomti, Clean-Up Drive Begins Today

    0
    By Aruna Sharma on May 2, 2025 UP and States

    (HT)

    Over one-and-a-half months after the Lucknow Municipal Corporation (LMC) promised to remove water hyacinth from the Gomti river, large stretches remain choked, especially near the Bhainsakund area. Despite earlier claims that the river would be cleared from water hyacinth within a month, LMC has failed to control the invasive plant’s rapid spread.

    The unchecked growth has allowed water hyacinth to accumulate in bulk, blocking water flow and posing serious ecological risks. The dense patches have now clustered near the riverbanks, worsening the situation.

    LMC officials resumed a limited clean-up drive on Wednesday and announced that a regular drive will start again on Friday. “We conducted cleaning on Wednesday and will resume regular operations from Friday,” said LMC chief engineer Manoj Prabhat. “The growth rate of water hyacinth is alarming. A one-metre patch can double in size within a day.” Officials admitted that the delay in setting up a boom barrier meant to block floating debris has also contributed to the worsening situation. The barrier, funded through Corporate Social Responsibility (CSR) initiatives, was to be installed near Kudiya Ghat but remains on hold. Prabhat said an inspection will be carried out on Friday with CSR officials and a professor from the university to finalise the barrier’s location. LMC has also begun planning long-term solutions. “We’re working to divert sewage to treatment plants using a tapping method,” said a senior LMC official. The LMC plans to install mesh barriers at key locations to trap floating waste. htc

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    K Kavitha Remembers Ajit Singh For His Contribution To Telangana Movement

    यूपी: पूरा प्रदेश ठंड और कोहरे की चपेट में

    यूपी: पूर्व डीजीपी प्रशांत कुमार बने उत्तर प्रदेश शिक्षा सेवा चयन आयोग के अध्यक्ष

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.