Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • SC To Hear Plea Against Vijay’s Visit To Karur Victims
    • ZEE5 Urges Fans To Avoid Piracy After Satluj Removal
    • Ali Fazal, Richa Chadha Reunite For Delhi Comedy
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Vaishnodevi Ropeway To Undergo Trial Shortly

    Vaishnodevi Ropeway To Undergo Trial Shortly

    0
    By Amit Bhanot on May 9, 2018 National

    (PTI)

    The ropeway to the cave shrine of Mata Vaishnodevi in Trikuta hills of Jammu and Kashmir’s Reasi district will undergo trial shortly. A senior officer of Shri Mata Vaishnodevi Shrine Board (SMVSB) said that once the ropeway project gets completed, pilgrims will be able to pay obeisance at Bhaironji Temple which was difficult to visit, particularly for the elderly and specially-abled pilgrims, owing to a steep climb to an altitude of 6,600 feet.

    “Bhawan-Bhairon Ghati Passenger Ropeway Project is at an advanced stage of completion and will be put on trial run shortly,” he said, adding it would have a carrying capacity of 800 people per hour.Similarly, the ropeway being installed between Siar Dabri and Bhawan is also in the very advanced stage of completion and is expected to be operationalised within the next few days, the official said.

    This will help in carrying construction and other materials such as food and water used by the yatris thereby affording relief to the pedestrian using the track. It will also be used for ferrying waste material to Katra for disposal.In view of shifting of Cabins of the upcoming Bhawan-Bhairon Ghati Passenger Ropeway from Adhkuwari to Bhawan, the Himkoti Track will remain temporarily closed for pilgrims from May 10 to May 14.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    FIFA World Cup: Portugal Face Spain in Round of 16 as Quarter-final Line-up Takes Shape

    Celina Jaitly to Play Sister Nivedita in Ram Kamal Mukherjee’s Biographical Drama

    Political Row Erupts After Diljit Dosanjh’s ‘Satluj’ Removed from OTT Platform

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Rupee Ends Lower At 95.38 Against U.S. Dollar

    July 8, 2026

    U.S. Strikes Iran After Hormuz Ship Attacks

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Mbappé Slams Racist Remarks By Paraguayan Senator

    July 7, 2026

    Ronaldo’s World Cup Dream Ends

    Company
    Company
    Recent Posts
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.