Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • No Fuel Price Hike In 4 Years, India Has Adequate Stocks: Hardeep Puri
    • NHAI Successfully Defends Arbitration Claims in Panipat–Jalandhar Highway Project Disputes
    • Vice President Addresses 51st Convocation Ceremony Of AIIMS New Delhi
    • Genus Innovation Unveils Hi-FLO Hybrid Solar Inverter
    • Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra
    • यूपी: प्रदेश को भीषण गर्मी से मिली राहत
    • India Meets A Record 256 GW Peak Power Demand Without Shortages
    • Sandeep Poundrik Inaugurated Skill Development Courses For Secondary Steel Sector
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Reliance Power Arm Wins 350 MW Solar And 175 MW BESS Project from SJVN.

    Reliance Power Arm Wins 350 MW Solar And 175 MW BESS Project from SJVN.

    0
    By Aruna Sharma on May 16, 2025 PRIVATE SECTOR

    (CW)

    Reliance Power announced its subsidiary, Reliance NU Energies, had secured the largest allocation under SJVN’s tariff-based competitive bidding process. The company was awarded 350 MW of solar generation capacity, along with 175 MW/700 MWh of battery energy storage system (BESS).

    In a regulatory filing, the company stated that upon commissioning, the project would add 600 MWp of installed solar PV capacity and 700 MWh of energy storage to its portfolio. With this development, Reliance Power’s total clean energy pipeline now stands at 2.5 GWp of solar and more than 2.5 GWhr of BESS capacity.

    The exchange filing further mentioned that the winning tariff was discovered at Rs 3.33/kWh, fixed for a 25-year term, making the project one of the most competitively priced offerings in India’s energy transition space. The company also noted that the Letter of Award (LoA) from SJVN was awaited.

    The project forms part of a broader tender issued by SJVN for 1,200 MW of solar capacity combined with 600 MW/2,400 MWh of BESS, to be connected to the Inter-State Transmission System (ISTS). The tender attracted participation from 19 entities, with 18 qualifying for the e-reverse auction. It was oversubscribed by more than four times.

    According to Reliance Power, the awarded project includes a requirement for a minimum daily discharge window of four hours, ensuring reliable peak power supply to state distribution utilities (Discoms). The project will be developed under a build-own-operate (BOO) model, in line with the standard bidding guidelines issued by the Ministry of Power.

    The company remarked that this successful bid reflected its continued commitment to becoming a key player in India’s renewable energy sector. It considered the win a major milestone in its strategic journey toward cleaner energy sources and its role in advancing the country’s sustainable energy future.

    Additionally, the company’s wholly owned subsidiary, Reliance NU, recently signed a 25-year definitive Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI) for the development of Asia’s largest integrated solar and BESS project. The project will have a solar capacity of 930 MW paired with 465 MW/1860 MWh of BESS, involving an investment of up to Rs 100 billion.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Genus Innovation Unveils Hi-FLO Hybrid Solar Inverter

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    May 12, 2026

    No Fuel Price Hike In 4 Years, India Has Adequate Stocks: Hardeep Puri

    May 12, 2026

    NHAI Successfully Defends Arbitration Claims in Panipat–Jalandhar Highway Project Disputes

    May 12, 2026

    Vice President Addresses 51st Convocation Ceremony Of AIIMS New Delhi

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • No Fuel Price Hike In 4 Years, India Has Adequate Stocks: Hardeep Puri
    • NHAI Successfully Defends Arbitration Claims in Panipat–Jalandhar Highway Project Disputes
    • Vice President Addresses 51st Convocation Ceremony Of AIIMS New Delhi
    • Genus Innovation Unveils Hi-FLO Hybrid Solar Inverter
    • Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.