Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » R K Singh Lays Foundation Stone Of The 60 MW Naitwar Mori Hydro Electric Project In Uttarkashi

    R K Singh Lays Foundation Stone Of The 60 MW Naitwar Mori Hydro Electric Project In Uttarkashi

    0
    By Aruna Sharma on March 31, 2018 ENERGY

    Shri R K Singh, Minister of State (IC) for Power and New & Renewable Energy, Government of India, laid the foundation stone of the 60 MW Naitwar Mori Hydro Electric Project (NMHEP) along with Uttarakhand Chief Minister Shri Trivendra Singh Rawat in Uttarkashi today.

    Speaking on the occasion Shri RK Singh emphasised the role of electricity in socio-economic development and reiterated the Government’s commitment to bring power to every household- specially the most deprived and marginalised ones. Calling hydro-power a clean and green source of energy, the Minister stated that development and environment can go hand in hand. “As Indians we are equally, if not more, concerned about our own environment and we are duty-bound to leave a better world for future generations,” he said. He congratulated the people of Uttrakhand for Naitwar Mori Hydro Electric Project.

    The Proposed Naitwar Mori Hydro Electric Project (NMHEP) is located on the river Tons – a tributary of the Yamuna, in Uttarkashi district of Uttarakhand. This run-of-the river project was allocated to SJVN Ltd by the Government of Uttarakhand.  SJVN Ltd is a Mini Ratna PSU under administrative control of the Ministry of Power, Govt. of India.

    With environment clearance accorded in 2016, all statutory clearances for the project are in place. Major civil works were awarded in December, 2017 and the project is scheduled to be completed by December, 2021, in a period of 4 years. It will have two underground generating units of 30 MW each. The estimated project cost at October 2016 PL is Rs. 648.33 crore with a debt equity ratio of 70:30. Levelised tariff is Rs. 6.39 per unit.

    Naitwar Mori Hydro Electric Project will add 265.5 Million Units of renewable energy to the grid and would result in CO2 emissions reductions to the tune of 0.21 Million tons annually. Besides socio-economic development and employment generation, the project would provide 12 per cent free power to Government of Uttarakhand and 1 per cent additional for Local Area Development Fund (LADF).

    All precautions have been taken to minimise the environmental impact of the project. Compensatory afforestation will be done on double the forest land acquired for the project, with a total cost is Rs. 3.74 crore. A provision of Rs. 1 crore has been made for construction of fishway for better fisheries management and muck disposal plan has also been put in place to stabilise the dumping sites.

    Secretary, Power; CMD, SJVN; Joint Secretary (Hydro); Director, SJVN and many eminent personalities from Uttarkashi graced the occasion.

    Technical details of the Project:

    • NMHEP envisages construction of 30.50 m high barrage located at d/s of the confluence of Rupin and Tons rivers at village Naitwar, 4.33 km long Head Race Tunnel having 5.6 m dia., 51.65 m deep surge shaft with a dai of 18 m.
    • The project utilizes a net head of 90.76 m. to generate 265.50 MU in a 90 per cent dependable year.
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.