Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Aamir Khan to Marry Gauri Spratt on July 5
    • Sabalenka Stunned In French Open Quarters
    • Centre Steps Up El Niño Preparedness To Protect Farmers
    • Applications Open For PM Research Chair Scheme 2026
    • India Eyes Global Leadership In Bio-Economy
    • India’s Seafood Exports Hit Record High
    • India-Oman CEPA Comes Into Force
    • Varanasi To Host BRICS Culture Meeting
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Pralhad Joshi Reviews Coal Production From Commercial And Captive Mines

    Pralhad Joshi Reviews Coal Production From Commercial And Captive Mines

    0
    By Amit Bhanot on July 6, 2023 ENERGY

    Union Minister of Coal, Mines and Parliamentary Affairs Shri Pralhad Joshi reviewed coal production performance of commercial and captive mines in a meeting with senior officials of the Ministry of Coalhere today.In a tweet, the Minister said thatproduction from captive and commercial coal mines have been steadily increasing over the years, registering 216 % growth during the last six years.In today’s meetingShri Joshi deliberated on ways to increase coal production by 39% in this fiscal from commercial and captive mines.The Ministeralso took stock of production from underground coal mines and emphasized on Underground Coal Mine Mission Plan to achieve 100 million tonne coal production.

    In June 2020, Prime Minister Shri Narendra Modi launched the first-ever commercial coal mines auction under the CM (SP) Act of 2015/ MMDR Act of 1957. So far, six tranches of commercial coal mines auctions have been completed and a total of 86 coal mines with a total annual production capacity of 218.9 million tonne per annum (MTPA) have been successfully auctioned. The 7th tranche of commercial coal mines auctions offering a total of 98 mines is in progress.

    Prior to the start of commercial coal mine auctions, the average duration for operationalization of coal mine was around fiveyears.However, the average duration of operationalization of coal mines after commercial auctions has been reduced considerably and the result is already seen with contribution of production from the commercial mines.The first commercial coal mine started production within one year from its allocation. Coal production from commercial coal mines in FY 2021-22 was 1.15 million tonne (MT) and 7.12 MT in FY 2022-23 with four commercial coal blocks i.e. Sulyari, Garepalma IV/1, Garepalma IV/7 and Gotitoriamines. It is expected that additional six commercially auctioned coal mines are likely to be operationalized in FY 2023-24 with an expected coal production of 12.2 million tonne (MT).

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    SKF Awards Global AI-Led Business Transformation Contract To TCS

    Govt Forms High-Level Committee on Demographic Change

    India, Ethiopia Sign WTO Accession Deal

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    June 3, 2026

    Aamir Khan to Marry Gauri Spratt on July 5

    June 3, 2026

    Sabalenka Stunned In French Open Quarters

    June 3, 2026

    Centre Steps Up El Niño Preparedness To Protect Farmers

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    June 3, 2026

    Sabalenka Stunned In French Open Quarters

    June 1, 2026

    RCB’s Short-Ball Tactic Crushes Gujarat Titans In Final

    May 30, 2026

    Vinesh Cleared For 53kg Asiad Trials

    Company
    Company
    Recent Posts
    • Aamir Khan to Marry Gauri Spratt on July 5
    • Sabalenka Stunned In French Open Quarters
    • Centre Steps Up El Niño Preparedness To Protect Farmers
    • Applications Open For PM Research Chair Scheme 2026
    • India Eyes Global Leadership In Bio-Economy
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.