Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » NTPC Signs MoU With Government of Bihar

    NTPC Signs MoU With Government of Bihar

    0
    By Aruna Sharma on May 15, 2018 ENERGY

    With an aim to improve the performance of Power Sector in Bihar, a Memorandum of Understanding (MoU) was signed between the Government of Bihar (GoB) and NTPC Limited today at Patna in the presence of the Union Minister of State (Independent Charge) for Power and New & Renewable Energy, Shri R. K. Singh and Chief Minister of Bihar, Shri Nitish Kumar.

    The MoU envisages transfer of Barauni Thermal Power Station (720 MW) to NTPC. In addition to this, Bihar State Power Generation Company’s (BSPGCL) equities in Kanti Bijlee Utpadan Nigam Limited (KBUN) & Nabinagar Power Generating Company (Pvt.) Limited (NPGC) will also be transferred to NTPC.

    All the three power generation facilities are envisaged to be transferred to NTPC from the effective date to be notified by Government of Bihar through a Statutory Transfer Scheme. The transfer of these power stations to NTPC will result in their optimal & efficient utilization, bring the tariff down and benefit the people of Bihar at large.

    Power from all the three power station shall be available to State of Bihar as before after approval by the Ministry of Power, Government of India. Energy Minister of Bihar Shri Bijendra Prasad Yadav; Principal Secretary, Department of Energy, Bihar Shri Pratyaya Amrit and CMD, NTPC Limited Shri Gurdeep Singh were among the dignitaries present at the occasion.

    Background:

    NTPC, a Maharatna Company under Ministry of Power, Govt. of India is the largest power generating company of India with a total installed capacity of 53651 MW (including JVs) from coal, gas, hydro, solar and wind power projects. NTPC is on an accelerated growth trajectory to meet this long-term targets and currently has 21,071 MW capacity under construction. Company has two operational coal mines. NTPC in the past has demonstrated strong capability in turning around under-performing state owned power stations.

    Barauni Thermal Power Station (720 MW) which is located at Begusarai district in Bihar. The Plant comprise of Stage-I (2×110 MW) (under advance stages of R&M) and Stage-II (2×250 MW) (under construction).NTPC with its expertise in construction of power projects and contract management capabilities is expected to complete the balance works and achieve sustained commercial operation of units in a time bound manner.

    Nabinagar Power Generating Company (Pvt) Limited is a 50:50 Joint Venture Company of NTPC Limited and Bihar State Power Generation Company Limited (BSPGCL). The Company is developing a 1980 MW (3×660 MW) Nabinagar Super Thermal Power Project in district Aurangabad, Bihar. The project is currently under-construction.

    Kanti Bijli Utpadan Nigam Limited (KBUNL) is a subsidiary company of NTPC Limited in Joint Venture with Bihar State Power Generation Company Limited (BSPGCL). Currently NTPC and BSPGCL owns 72.64%and 27.36% equity holding in KBUNL respectively. KBUNL owns and operates Muzaffarpur Thermal Power Station (MTPS) (2×110 MW+ 2×195 MW) situated at Kanti, District Muzaffarpur in the State of Bihar. Plant is under operation.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.