Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    • WTO Likely To Release India’s Trade Policy Review Report In July
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » NTPC Group Installed Capacity Stands At 80,265 MW Post Commissioning Of 110.25 MW Solar Supply

    NTPC Group Installed Capacity Stands At 80,265 MW Post Commissioning Of 110.25 MW Solar Supply

    0
    By Aruna Sharma on June 7, 2025 ENERGY

    (ET)

    Power giant NTPC on Friday said its group installed generation capacity stood at 80,265 MW after its step-down arm NTPC Renewable Energy began 110.25 MW commercial supply from 1255 MW Khavda solar project.

    In a regulatory filing, the company said consequent upon successful commissioning, first part capacity of 110.25 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Ltd, a wholly-owned subsidiary of NTPC Green Energy, is declared on Commercial Operation “w.e.f. 00:00 Hrs. of June 6, 2025”.

    NTPC Green Energy is a subsidiary of NTPC Ltd.

    With this, the total installed and commercial capacity of the NTPC group stood at 80,265 MW, the filing said.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    India’s Nuclear Energy Expansion: Targeting 100 GW by 2047

    Cabinet Approves ₹7,000 Crore Investment Exemption For NLCIL To Boost Renewable Energy Expansion

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    April 14, 2026

    ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    August 6, 2025

    Hero MotoCorp Q1 Profit Surges 65% to ₹1,706 Crore on Ather Energy IPO Gains

    Company
    Company
    Recent Posts
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.