Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • NTA Revises Re-NEET Centre In Prayagraj
    • India-US Ties Need Respect, Not Dependence
    • India Blocks Telegram Ahead Of NEET Retest
    • CJP Seeks Action Over Student Suicides
    • Gold Imports Plunge After Duty Hike
    • Oil Prices May Ease After US-Iran Deal
    • Intel Surges After Apple Chip Deal Announcement
    • India’s Oil Reserves Lag Behind Peers: Report
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » NHAI Awards Contract For Dwarka Expressway In Haryana

    NHAI Awards Contract For Dwarka Expressway In Haryana

    0
    By Amit Bhanot on March 13, 2018 National

    The National Highways Authority of India, NHAI, has issued Letter of Award – LOA for Package-4 of Dwarka Expressway from Basai RoB to NH-8 – SPR intersection in the State of Haryana on EPC under Bharatmala Pariyojna. Development of this section of Dwarka Expressway will ensure seamless and safe movement of traffic between Delhi-Gurgaon and help in decongestion of existing Delhi-Gurugaon Expressway.

    This eight-lane Expressway (NH-248 BB) will be constructed on EPC Mode at a cost of Rs 1047.007 crore. The 8.76 km stretch of the road will be constructed by M/s Larsen and Toubro Ltd. The project comprises of 8-lane elevated structure for main carriageway of Dwarka Expressway, Trumpet Interchange for Manesar Road and Cloverleaf interchange with NH-8-SPR intersection.  The completion period of the project is two years with maintenance period of four years. Under the project, a minor bridge will be widened, additional ROBs, five VUP, six Bus Bays with Bus Shelter will be erected and four Junction Improvements will be carried out.

    Dwarka Expressway has to be implemented in 5 Packages. The first package of 5.3 kms is from Shiv Murti to RuB, the second of 4.2 kms from RuB to Haryana border, package 3 from Haryana border to Basai RoB – 10.2 Kms, package 4 from Basai RoB to NH-8 – SPR intersection – 8.77 Kms, and the fifth package – 5 kms of Western Airport Connectivity from Dwarka Expressway through tunnel.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    India-US Ties Need Respect, Not Dependence

    India Blocks Telegram Ahead Of NEET Retest

    CJP Seeks Action Over Student Suicides

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    June 19, 2026

    NTA Revises Re-NEET Centre In Prayagraj

    June 19, 2026

    India-US Ties Need Respect, Not Dependence

    June 19, 2026

    India Blocks Telegram Ahead Of NEET Retest

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    June 19, 2026

    Mexico Tops Group A With South Korea Win

    June 19, 2026

    Koné Suffers Serious Injury In Canada Win

    June 19, 2026

    South Africa Survive Pakistan Scare

    Company
    Company
    Recent Posts
    • NTA Revises Re-NEET Centre In Prayagraj
    • India-US Ties Need Respect, Not Dependence
    • India Blocks Telegram Ahead Of NEET Retest
    • CJP Seeks Action Over Student Suicides
    • Gold Imports Plunge After Duty Hike
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.