Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • No Fuel Price Hike In 4 Years, India Has Adequate Stocks: Hardeep Puri
    • NHAI Successfully Defends Arbitration Claims in Panipat–Jalandhar Highway Project Disputes
    • Vice President Addresses 51st Convocation Ceremony Of AIIMS New Delhi
    • Genus Innovation Unveils Hi-FLO Hybrid Solar Inverter
    • Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra
    • यूपी: प्रदेश को भीषण गर्मी से मिली राहत
    • India Meets A Record 256 GW Peak Power Demand Without Shortages
    • Sandeep Poundrik Inaugurated Skill Development Courses For Secondary Steel Sector
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Inland Water Transport Projects in Uttar Pradesh: Status and Economic Impact

    Inland Water Transport Projects in Uttar Pradesh: Status and Economic Impact

    0
    By Aruna Sharma on July 25, 2025 UP and States

    The Inland Waterways Authority of India (IWAI) has undertaken several projects to develop Inland Water Transport (IWT) infrastructure in Uttar Pradesh, aimed at enhancing connectivity, reducing logistics costs, promoting sustainable transport, and boosting river cruise tourism. The economic impact of these projects includes the creation of an alternative mode of transport, reduced carbon emissions, increased tourism potential, and overall logistical efficiency.

    Completed IWT Projects in Uttar Pradesh

    Sl. No. Name of Sub Project Cost (Rs. Cr.)
    1. Development of Multimodal Terminal at Varanasi 182.33
    2. Development of 11 Community Jetties in Varanasi, Chandauli, Ghazipur & Ballia 17.00
    3. Installation of 2 Jetties at Ayodhya on NW-40 (Ghaghara River) 4.00
    4. Deployment of 2 Electric Catamarans at Varanasi and Ayodhya 25.60
    5. Introduction of 1 Hydrogen Fuel Cell Vessel at Varanasi 22.62
    Total Completed Project Cost 251.55

    Ongoing IWT Projects in Uttar Pradesh

    Sl. No. Name of Sub Project Cost (Rs. Cr.)
    1. Fairway Development from Majhauwa to Ghazipur 78.64
    2. Development of 4 Steel Community Jetties in Ballia and Ghazipur 7.82
    3. Fairway Development from Ghazipur to Varanasi 102.98
    4. IWT Jetties at Mathura (6 installed; 2 under construction) 12.00
    5. Quantity-based Dredging in Ayodhya and Mathura projects (NW-40 to NW-110) 8.45
    6. Development of River Cruise Terminal at Varanasi 200.00
    7. Development of Regional Centre of Excellence at Varanasi 150.00
    8. Development of Ship Repair Facility 50.00

    Freight Village at Varanasi

    To support cargo movement and improve supply chain efficiency, IWAI has acquired 75 acres of land in Chandauli district for the development of a Freight Village adjacent to the Varanasi Multi-Modal Terminal. This logistics hub is expected to bring:

    • Significant employment opportunities in logistics and allied sectors

    • Support for MSMEs and farmers through better storage and transport connectivity

    • Reduced urban traffic congestion by diverting freight movement from city roads

    Addressing Challenges

    The key challenges in IWT—such as availability of fairway and terminal infrastructure—are being effectively addressed through ongoing dredging, bandalling, and the construction of modern jetties. These efforts aim to make IWT a viable, eco-friendly, and efficient transportation alternative in the region.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra

    यूपी: प्रदेश को भीषण गर्मी से मिली राहत

    पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    May 12, 2026

    No Fuel Price Hike In 4 Years, India Has Adequate Stocks: Hardeep Puri

    May 12, 2026

    NHAI Successfully Defends Arbitration Claims in Panipat–Jalandhar Highway Project Disputes

    May 12, 2026

    Vice President Addresses 51st Convocation Ceremony Of AIIMS New Delhi

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • No Fuel Price Hike In 4 Years, India Has Adequate Stocks: Hardeep Puri
    • NHAI Successfully Defends Arbitration Claims in Panipat–Jalandhar Highway Project Disputes
    • Vice President Addresses 51st Convocation Ceremony Of AIIMS New Delhi
    • Genus Innovation Unveils Hi-FLO Hybrid Solar Inverter
    • Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.