Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • 48 घंटे में दूसरी बार महंगी हुई CNG, दिल्ली-NCR में वाहन चालकों पर बढ़ा बोझ
    • Government Calls For Stronger Protection Of Citizen Data
    • Government Launches New Initiative For School Dropouts
    • Amit Shah To Inaugurate Automated Madhur Dairy Unit-2 In Gandhinagar
    • India Pushes Stronger BRICS Trade Cooperation At Gandhinagar Meeting
    • PM Witnesses Tata-ASML Semiconductor Deal In Gujarat
    • Delhi Records Below-Normal Night Temperatures Amid Strong Wind Forecasts
    • PM Extend Wishes On Sikkim Statehood Day
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » India Meets A Record 256 GW Peak Power Demand Without Shortages

    India Meets A Record 256 GW Peak Power Demand Without Shortages

    0
    By Aruna Sharma on April 28, 2026 INTERNATIONAL

    India has successfully met its all-time highest peak electricity demand of 256.1 GW on 25th April 2026 at 15:38hrs without any shortage, while simultaneously maintaining electricity exports to neighbouring countries.

    This milestone surpasses the previous all-time high of 250 GW recorded on 30th May 2024 and exceeds the peak of 245.4 GW observed on 09th January 2026 during the last financial year.

    The rise in demand is in line with the progression of summer conditions across the country, with electricity consumption witnessing a significant growth of 8.9% during the month of April 2026 (01st to 27th Apr) over the corresponding period last year.

    The achievement has been supported by record capacity addition of around 65 GW during FY 2025–26, strengthening the overall generation portfolio and enhancing system preparedness to handle high demand conditions. With this we can successfully meet the expected demand of around 270 GW this year.

    The demand was met through advance resource adequacy planning, optimal scheduling and dispatch of available generation resources, and close real-time coordination among NLDC, RLDCs, SLDCs, and generating stations, supported by efficient utilization of transmission corridors.

    At the time of peak demand, the requirement was met through a diverse portfolio of generation sources, including thermal, hydro, nuclear, and renewable energy, ensuring reliability and grid stability. Renewable energy, particularly solar, made a significant contribution, complemented by hydro and other flexible resources during peak conditions.

    Grid frequency and Source-wise contribution at Peak Demand Met

    Time 15:38
    All India Peak Demand Met 256117 MW
    Grid Frequency 50.00 Hz
    Source MW (ex-bus) % (of Total Gen)
    Gas 5205 2.0%
    Hydro 11422 4.4%
    Nuclear 6293 2.4%
    Thermal 174565 66.9%
    Wind 4897 1.9%
    Solar 56204 21.5%
    Storage (PSP & BESS) 201 0.1%
    Others 2110 0.8%

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    India Pushes Stronger BRICS Trade Cooperation At Gandhinagar Meeting

    Rajasthan Railway Stations Get Major Upgrade Under Amrit Bharat Scheme

    Jayant Chaudhary Represents India At Uganda Ceremony

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    May 17, 2026

    48 घंटे में दूसरी बार महंगी हुई CNG, दिल्ली-NCR में वाहन चालकों पर बढ़ा बोझ

    May 17, 2026

    Government Calls For Stronger Protection Of Citizen Data

    May 17, 2026

    Government Launches New Initiative For School Dropouts

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • 48 घंटे में दूसरी बार महंगी हुई CNG, दिल्ली-NCR में वाहन चालकों पर बढ़ा बोझ
    • Government Calls For Stronger Protection Of Citizen Data
    • Government Launches New Initiative For School Dropouts
    • Amit Shah To Inaugurate Automated Madhur Dairy Unit-2 In Gandhinagar
    • India Pushes Stronger BRICS Trade Cooperation At Gandhinagar Meeting
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.