Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • SC To Hear Plea Against Vijay’s Visit To Karur Victims
    • ZEE5 Urges Fans To Avoid Piracy After Satluj Removal
    • Ali Fazal, Richa Chadha Reunite For Delhi Comedy
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Govt. Takes One More Measure To Improve Financial Health Of Discoms By Ensuring Cost-Reflective Tariff Through Elimination Of Revenue Gap

    Govt. Takes One More Measure To Improve Financial Health Of Discoms By Ensuring Cost-Reflective Tariff Through Elimination Of Revenue Gap

    0
    By Navel Kumar on January 16, 2024 ENERGY

    For ease of doing business by industries like Green Hydrogen manufacturers and to facilitate energy transition along with energy security by faster establishment of energy storage capacity new rules have been prescribed. Now consumers, having more than a specified quantum of load and Energy Storage Systems (ESS) are allowed to establish, operate and maintain dedicated transmission lines themselves without the requirement of licence. By allowing such facility a new category of Bulk Consumers would emerge in the country, benefiting from more affordable electricity and enhanced grid reliability. This facility was already available to generating companies and captive generating stations.

    The new rule prescribes that a generating company or a person setting up a captive generating plant or an Energy Storage System or a consumer having load of not less than twenty five Megawatt in case of Inter State Transmission System and ten Megawatt in case of Intra-State Transmission System shall not be required to obtain licence for establishing, operating or maintaining a dedicated transmission line to connect to the grid, if such company or person or consumer complies with the Regulations, technical standards, guidelines and procedures issued under the provisions of the Act.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Navel Kumar
    • Website

    Related Posts

    Oil Prices Fall After US-Iran Talks Progress

    India Ramps Up Russian, UAE Oil Imports Ahead Of Hormuz Recovery

    Crude Oil Falls As Iran Peace Deal Hopes Rise

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Rupee Ends Lower At 95.38 Against U.S. Dollar

    July 8, 2026

    U.S. Strikes Iran After Hormuz Ship Attacks

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Mbappé Slams Racist Remarks By Paraguayan Senator

    July 7, 2026

    Ronaldo’s World Cup Dream Ends

    Company
    Company
    Recent Posts
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.