Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Experience Everyday Comfort with Voltas Water Heaters
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • SC To Hear Plea Against Vijay’s Visit To Karur Victims
    • ZEE5 Urges Fans To Avoid Piracy After Satluj Removal
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Government To Auction Power Transmission Contracts Worth Rs 8,000 crore

    Government To Auction Power Transmission Contracts Worth Rs 8,000 crore

    0
    By Aruna Sharma on December 22, 2018 ENERGY

    (ET)

    The government will soon auction power transmission contracts worth over Rs 8,000 crore connecting renewable energy projects in western and northern states while it has deferred a decision on lines worth Rs 5,500 crore. Minutes of a meeting of National Committee on Transmission (NCT) held on December 4 showed that contracts worth about Rs 3,500 crore have been awarded on nomination basis to Power Grid Corp (PGCIL). Private sector firms such as Tata Power, Adani Power Transmission, L&T Infra, Torrent Power, Kalpataru Power Transmission and Megha Engineering had earlier bid for such contracts.

    The government has also compressed the timeline for implementing the projects to 18 months while setting September 2020 as the target completion date for some projects. Power transmission companies have welcomed the move but have demanded the government to half the auction timeline from the planned 140 days to 70 days. The companies have also said the government can auction transmission lines instead of deferring them and a green signal can be given later to the selected company to match the schedule of generation projects.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Experience Everyday Comfort with Voltas Water Heaters

    FIFA World Cup: Portugal Face Spain in Round of 16 as Quarter-final Line-up Takes Shape

    Celina Jaitly to Play Sister Nivedita in Ram Kamal Mukherjee’s Biographical Drama

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    July 24, 2026

    Experience Everyday Comfort with Voltas Water Heaters

    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Rupee Ends Lower At 95.38 Against U.S. Dollar

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Mbappé Slams Racist Remarks By Paraguayan Senator

    July 7, 2026

    Ronaldo’s World Cup Dream Ends

    Company
    Company
    Recent Posts
    • Experience Everyday Comfort with Voltas Water Heaters
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.