Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    • WTO Likely To Release India’s Trade Policy Review Report In July
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Gautam Adani meets Bangladesh PM as Godda power plant resumes power supply to nearby areas

    Gautam Adani meets Bangladesh PM as Godda power plant resumes power supply to nearby areas

    0
    By Harish Tiwari on July 16, 2023 ENERGY, National, PRIVATE SECTOR

    Adani Group Chairman Gautam Adani met Bangladesh Prime Minister Sheikh Hasina in Dhaka after power supply to the neighbouring country started from the group’s Ultra-Supercritical Thermal Power Plant (USCTPP) located in Godda, Jharkhand. Adani Power Limited started exporting electricity to Bangladesh from its 1,600 MW power project on April 10, 2023.

    The group, which reached power from the port, called it “a shining example of India-Bangladesh cooperation” in a statement on Saturday. The Godda USCTPP marks the Adani Group’s entry into international power projects. This is India’s first ongoing international power project where 100 per cent of the electricity generated is supplied to another country, it said.

    In a statement, the Adani Group said, “Chairman Gautam Adani met Bangladesh Prime Minister Sheikh Hasina in Dhaka on Saturday following the full load start of power supply to Bangladesh from the group’s ultra super-critical thermal power plant in Godda, India.” ”

    “Honoured to meet Bangladesh Prime Minister Sheikh Hasina on the full load start and handover of the 1600 MW Ultra Super-Critical Godda Power Plant. I salute the dedicated teams of India and Bangladesh who dared to make the plant operational in a record time of three. One and a half years,” Adani tweeted after meeting the Bangladesh Prime Minister.

    I am honoured to meet Bangladesh Prime Minister Sheikh Hasina on the full load start and handover of the 1600 MW Ultra Supercritical Godda Power Plant. I salute the dedicated teams of India and Bangladesh who fought COVID to make the plant operational in a record time of three and a half years.

    Under the Power Purchase Agreement (PPA) signed with Bangladesh Power Development Board, the Godda power plant will supply 1,496 MW of power to Bangladesh for a period of 25 years. This power will be transmitted through a dedicated 400 kV transmission system connected to the Bangladesh grid. The PPA was executed in November 2017.

    On April 6, commercial operations started from the first unit of the Godda plant, which has a capacity of 800 MW. Subsequently, the second unit with a capacity of 800 MW also started operations on June 26.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Harish Tiwari

    Related Posts

    Modi Inaugurates Delhi-Dehradun Expressway

    WTO Likely To Release India’s Trade Policy Review Report In July

    EC Releases Third Supplementary Voter List In Bengal

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    April 14, 2026

    ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    August 6, 2025

    Hero MotoCorp Q1 Profit Surges 65% to ₹1,706 Crore on Ather Energy IPO Gains

    Company
    Company
    Recent Posts
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.