Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • SC To Hear Plea Against Vijay’s Visit To Karur Victims
    • ZEE5 Urges Fans To Avoid Piracy After Satluj Removal
    • Ali Fazal, Richa Chadha Reunite For Delhi Comedy
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Establishment Of Compressed Natural Gas Infrastructure

    Establishment Of Compressed Natural Gas Infrastructure

    0
    By Amit Bhanot on August 1, 2024 BUSINESS

    Establishment of Compressed Natural Gas (CNG) stations is part of the development of City Gas Distribution (CGD) Network and the same is being carried out by the entities authorised by Petroleum and Natural Gas Regulatory Board (PNGRB) as per their Minimum Work Programme (MWP). After completion of 12/12A CGD bidding round, PNGRB has authorized entities for the development of CGD network in 307 Geographical Areas (GAs),  covering almost 100% of the total geographical area of the country spread over around 733 districts in 34 states/UTs with MWP target of establishing 18,336 CNG stations across the country by 2032. To promote the use of CNG  in the country the Government has taken various measures which includes diverting domestic gas from power and other non- priority sectors to meet the requirement of CNG(Transport) and PNG (Domestic) segments; declaring CNG(T)/PNG(D) sector as the first priority for allocation of domestic natural gas; priority to CNG(T)/PNG(D) sector for supply of High Pressure High temperature (HP-HT) gas in any situation requiring proportionate distribution of gas under the bidding process, etc.

    This information was given by THE MINISTER OF STATE IN MINISTRY OF PETROLEUM AND NATURAL GAS SHRI SURESH GOPI, in a written reply in Lok Sabha today.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    Rupee Ends Lower At 95.38 Against U.S. Dollar

    Gadkari Defends E20 Fuel, Challenges Critics

    FIFA World Cup: Portugal Face Spain in Round of 16 as Quarter-final Line-up Takes Shape

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Rupee Ends Lower At 95.38 Against U.S. Dollar

    July 8, 2026

    U.S. Strikes Iran After Hormuz Ship Attacks

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Mbappé Slams Racist Remarks By Paraguayan Senator

    July 7, 2026

    Ronaldo’s World Cup Dream Ends

    Company
    Company
    Recent Posts
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.