Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Drainage from Nallahs into Ganga River

    Drainage from Nallahs into Ganga River

    0
    By khabarindia on August 10, 2017 National

    The National Green Tribunal (NGT) in its order dated 19th October, 2016 in OA No.200 of 2014 in the matter of M.C. Mehta vs Union of India had directed a joint inspection team to visit the area falling in Segment ‘B’ of Phase-I (Haridwar to Kanpur) and identify the number of drains joining river Ganga or its tributaries and make observations in relation to quantum and quality of effluent that is going to river Ganga or its main tributaries through drains.

    The joint inspection team submitted its report to the Hon’ble NGT. 86 major drains have been identified which are directly discharging into River Ganga (30 drains) and its major tributaries namely Ramganga (25 drains), Kali-East (26 drains) and Pandu river (5 drains). Of the 86 drains, 52 drains were found to be carrying domestic sewage, 2 were found to be carrying industrial effluent whereas remaining 32 were found to be carrying mixed effluent.

    Namami Gange Programme has been launched as a holistic approach to clean Ganga through various activities such as treatment of municipal sewage, treatment of industrial affluents, river surface cleaning, rural sanitation, afforestation and biodiversity etc. For checking entry of sewage affluents into river Ganga, sewage infrastructure projects are being sanctioned in towns along the main stem of river Ganga, which includes creation of Sewage Treatment Plants, sewage network projects and interception & diversion network to divert the flow of polluting drain towards treatment plants. To check industrial pollution, Central Pollution Control Board (CPCB) has inventorised 1109 Gross Polluting Industries (GPIs). These GPIs are being inspected and monitored regularly and closure directions are being issued to non-compliant industries.

    This information was given by Union Minister of State for Water Resources, River Development and Ganga Rejuvenation Dr. Sanjeev Kumar Balyan in a written reply in Lok Sabha today.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    khabarindia
    • Website
    • X (Twitter)

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.