Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Centre Steps Up El Niño Preparedness To Protect Farmers
    • Applications Open For PM Research Chair Scheme 2026
    • India Eyes Global Leadership In Bio-Economy
    • India’s Seafood Exports Hit Record High
    • India-Oman CEPA Comes Into Force
    • Varanasi To Host BRICS Culture Meeting
    • Education Ministry Honours Tobacco-Free Schools
    • India to Host 13th BRICS Urbanisation Forum
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » BHEL Wins Rs.11,700 Crore Order

    BHEL Wins Rs.11,700 Crore Order

    0
    By Aruna Sharma on March 9, 2018 ENERGY, Media Monitoring

    Amidst stiff international competitive bidding (ICB), Bharat Heavy Electricals Limited (BHEL) has won a Rs.11,700 Crore order for setting up a 3×800 MW supercritical thermal power plant in Jharkhand.  The order for setting up the 3×800 MW Patratu Super Thermal Power Station Expansion, Phase-I (3x 800 MW) has been placed on BHEL by Patratu Vidyut Utpadan Nigam Limited (PVUNL – a subsidiary of NTPC Ltd. in Joint Venture with Jharkhand Bijli Vitran Nigam Limited).

    Significantly, this is the single largest order ever placed by NTPC or its subsidiaries and the second largest order ever won by BHEL. Located at Patratu in Ramgarh district of Jharkhand, the project will be executed by BHEL on Engineering, Procurement and Construction (EPC) basis.

    The project will significantly contribute to the nation’s quest for clean and eco-friendly power in multiple ways. It will reduce fuel consumption by employing high efficiency equipment working at higher operating parameters. The commissioning of the project would also lead to phasing out of the old fleet of sub-critical units presently installed at Patratu, enabling a quantum leap in efficiency of the station.

    The project will further limit emissions by utilizing state-of-the-art Flue Gas Desulphurization (FGD) and Selective Catalytic Reduction (SCR) systems to capture pollutants like SOx and NOx. Significantly, the project is the largest of its kind in the country to be based on Air Cooled Condenser technology, which will result in conserving a large amount of water.

    BHEL has been a major partner in the power development programme of Jharkhand and is also currently executing the 3×660 MW North Karanpura Super Thermal Power Station located in Chatra district. Significantly, over 80% of the installed power generating capacity in the state of Jharkhand is equipped with BHEL sets.  Key equipment for the project will be manufactured at BHEL’s Trichy, Haridwar, Hyderabad, Ranipet, Bhopal, Bengaluru and Jhansi plants, while the company’s Power Sector – Western Region division will be responsible for construction and installation activities at the site.

    BHEL is the leading power equipment manufacturer with 56 sets of supercritical boilers and 49 sets of supercritical turbine generators ordered on it so far, by various customers in the domestic as well as overseas markets.BHEL is India’s largest manufacturer of power generation equipment with an installed base of over 1,80,000 MW of power plant equipment globally. In the supercritical segment, BHEL has successfully manufactured and executed 660 MW, 700 MW and 800 MW sets, thereby demonstrating its leadership status and technological prowess.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    SKF Awards Global AI-Led Business Transformation Contract To TCS

    Govt Forms High-Level Committee on Demographic Change

    India, Ethiopia Sign WTO Accession Deal

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    June 3, 2026

    Centre Steps Up El Niño Preparedness To Protect Farmers

    June 3, 2026

    Applications Open For PM Research Chair Scheme 2026

    June 3, 2026

    India Eyes Global Leadership In Bio-Economy

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    June 1, 2026

    RCB’s Short-Ball Tactic Crushes Gujarat Titans In Final

    May 30, 2026

    Vinesh Cleared For 53kg Asiad Trials

    May 30, 2026

    Bhuvneshwar Keeps Young Batters In Check

    Company
    Company
    Recent Posts
    • Centre Steps Up El Niño Preparedness To Protect Farmers
    • Applications Open For PM Research Chair Scheme 2026
    • India Eyes Global Leadership In Bio-Economy
    • India’s Seafood Exports Hit Record High
    • India-Oman CEPA Comes Into Force
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.