Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » BHEL Commissions 14 Pumping Units Of Kaleshwaram Lift Irrigation Scheme In Telangana

    BHEL Commissions 14 Pumping Units Of Kaleshwaram Lift Irrigation Scheme In Telangana

    0
    By Amit Bhanot on November 18, 2019 ENERGY

    Bharat Heavy Electricals Limited (BHEL) has commissioned two more pumping units each for Package-6 (7×116 MW) and Package-8 (7×139 MW) of Kaleshwaram Lift Irrigation Scheme (LIS). Notably, with this, BHEL has successfully commissioned all 14 pumping units of these packages within a record period of six months and well within the scheduled time. These are very large size pump sets with each pump designed to lift 89 cumecs of water against a head of 100 to 125 metres.

    Kaleshwaram is a greenfield irrigation project and is being developed by the Irrigation & CAD (I&CAD) department of the Government of Telangana. While, Package 6 is located in Peddapalli district, Package 8 is located in Karimnagar district of Telangana.

    In LIS Package 6, water shall be lifted from Sripada Yellampalli reservoir to Medaram reservoir and in Package 8, water shall be lifted from discharge of Package 7 (near Ragampet Village) to Mid Manair reservoir. BHEL’s scope in the project comprises Electrical & Mechanical (E&M) works, including design, manufacture, supply and supervision of erection & commissioning of these Vertical Pump-Motor sets along with associated auxiliaries in each package. The equipment has been supplied from BHEL’s manufacturing units at Bhopal, Rudrapur, Bengaluru and Jhansi, while the supervision of erection and commissioning at the site was carried out by the company’s Power Sector Southern Region division, Chennai.

    In Telangana, BHEL has so far commissioned 39 Pump-Motor sets of various ratings aggregating to 2,306 MW. In addition, BHEL is presently executing another 26 Pump-Motor sets totaling to 3,572 MW for various Lift Irrigation Schemes viz. Kaleshwaram LIS Package 10 & 11 and Palamuru Rangareddy LIS Package 5 & 8. Besides Lift Irrigation projects, BHEL has made significant contribution to the hydro sector of Telangana and has commissioned 1,073 MW of hydro power projects in the state so far.

    BHEL is presently executing hydroelectric projects of more than 6,000 MW, which includes 2,910 MW of projects within the country and 3,184 MW abroad.  In addition, BHEL is also carrying out comprehensive Renovation and Modernization of more than 684 MW hydro projects across the country. Significantly, more than 500 hydroelectric generating sets of various ratings have been ordered on BHEL with a cumulative capacity of more than     30,000 MW, including 6,680 MW for overseas projects. BHEL’s hydro plants are successfully performing in India and across the world, including countries such as Afghanistan, Azerbaijan, Bhutan, Malaysia, Taiwan, Tajikistan, Rwanda, Thailand, New Zealand, Nepal and Vietnam.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.