Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • TATA AIG Introduces MediCare Reserve
    • Voltas Crosses 1 Million AC Sales Milestone In FY 26-27
    • UP Teen Held For Killing Brother’s Family
    • Ammonia Leak At Tamil Nadu Seafood Unit Kills Seven
    • ‘Cockroach Party’ Protest Over NEET Enters Third Day
    • Bengal Budget Focuses On Jobs, Infrastructure and Welfare
    • US, Iran Reach Key Agreements In Switzerland Talks
    • Yamal Stars As Spain Thrash Saudi Arabia
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » Govt. Takes One More Measure To Improve Financial Health Of Discoms By Ensuring Cost-Reflective Tariff Through Elimination Of Revenue Gap

    Govt. Takes One More Measure To Improve Financial Health Of Discoms By Ensuring Cost-Reflective Tariff Through Elimination Of Revenue Gap

    0
    By Navel Kumar on January 16, 2024 ENERGY

    For ease of doing business by industries like Green Hydrogen manufacturers and to facilitate energy transition along with energy security by faster establishment of energy storage capacity new rules have been prescribed. Now consumers, having more than a specified quantum of load and Energy Storage Systems (ESS) are allowed to establish, operate and maintain dedicated transmission lines themselves without the requirement of licence. By allowing such facility a new category of Bulk Consumers would emerge in the country, benefiting from more affordable electricity and enhanced grid reliability. This facility was already available to generating companies and captive generating stations.

    The new rule prescribes that a generating company or a person setting up a captive generating plant or an Energy Storage System or a consumer having load of not less than twenty five Megawatt in case of Inter State Transmission System and ten Megawatt in case of Intra-State Transmission System shall not be required to obtain licence for establishing, operating or maintaining a dedicated transmission line to connect to the grid, if such company or person or consumer complies with the Regulations, technical standards, guidelines and procedures issued under the provisions of the Act.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Navel Kumar
    • Website

    Related Posts

    Oil Prices Fall After US-Iran Talks Progress

    India Ramps Up Russian, UAE Oil Imports Ahead Of Hormuz Recovery

    Crude Oil Falls As Iran Peace Deal Hopes Rise

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    June 23, 2026

    TATA AIG Introduces MediCare Reserve

    June 22, 2026

    Voltas Crosses 1 Million AC Sales Milestone In FY 26-27

    June 22, 2026

    UP Teen Held For Killing Brother’s Family

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    June 22, 2026

    Yamal Stars As Spain Thrash Saudi Arabia

    June 21, 2026

    Wahab Laments Pakistan’s Costly Collapse

    June 21, 2026

    Bumrah, Kohli Return For England ODIs

    Company
    Company
    Recent Posts
    • TATA AIG Introduces MediCare Reserve
    • Voltas Crosses 1 Million AC Sales Milestone In FY 26-27
    • UP Teen Held For Killing Brother’s Family
    • Ammonia Leak At Tamil Nadu Seafood Unit Kills Seven
    • ‘Cockroach Party’ Protest Over NEET Enters Third Day
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.