Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Modi Calls Indian Ocean An ‘Ocean of Opportunity’
    • Australia End India’s T20 World Cup Campaign
    • India Admit Failure To Adapt Against Ireland
    • Canada Reach First-Ever World Cup Last 16
    • Mirzapur: The Movie Unveils First Look Posters
    • Alka Yagnik Shares Health Update After Padma Bhushan Honour
    • South Africa Shock South Korea To Reach Last 32
    • Neymar Returns As Brazil Seal Group Top Spot
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » PM to dedicate India’s longest road tunnel to the nation

    PM to dedicate India’s longest road tunnel to the nation

    0
    By Aruna Sharma on March 30, 2017 PMO

    The Prime Minister, Shri Narendra Modi, will dedicate to the nation, India’s longest road tunnel – the 9 kilometre long “Chenani – Nashri Tunnel” – on April 2nd, 2017.

    The tunnel on NH-44 which connects Jammu with Srinagar, will reduce travel time between the two cities by upto two hours. It achieves a distance-reduction of 31 kilometres, bypassing snow-bound upper reaches. The estimated daily fuel savings are to the tune of Rs. 27 lakhs.

    Besides avoiding large scale deforestation and tree-cutting, the tunnel will provide a safe, all-weather route to commuters travelling from Jammu and Udhampur, to Ramban, Banihal and Srinagar.

    The tunnel is equipped with world-class security systems, and is expected to boost tourism and economic activities in the State of Jammu and Kashmir.

    Key Features of the tunnel

    • It is a single-tube bi-directional tunnel, with a 9.35 metre carriageway, and a vertical clearance of 5 metres.

    • There is also a parallel escape tunnel, with “Cross Passages” connecting to the main tunnel at intervals of 300 metres.

    • It also has smart features such as an Integrated Traffic Control System; Surveillance, Ventilation and Broadcast Systems; Fire Fighting System; and SOS call-boxes at every 150 metres.

    • The project has been completed at a cost of over Rs. 2500 crore

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    TATA AIG Introduces MediCare Reserve

    Voltas Crosses 1 Million AC Sales Milestone In FY 26-27

    India Ramps Up Russian, UAE Oil Imports Ahead Of Hormuz Recovery

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    June 29, 2026

    Modi Calls Indian Ocean An ‘Ocean of Opportunity’

    June 29, 2026

    Australia End India’s T20 World Cup Campaign

    June 29, 2026

    India Admit Failure To Adapt Against Ireland

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    June 29, 2026

    India Admit Failure To Adapt Against Ireland

    June 29, 2026

    Canada Reach First-Ever World Cup Last 16

    June 25, 2026

    South Africa Shock South Korea To Reach Last 32

    Company
    Company
    Recent Posts
    • Modi Calls Indian Ocean An ‘Ocean of Opportunity’
    • Australia End India’s T20 World Cup Campaign
    • India Admit Failure To Adapt Against Ireland
    • Canada Reach First-Ever World Cup Last 16
    • Mirzapur: The Movie Unveils First Look Posters
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.