Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » NCLT Allows Bankruptcy Proceedings Against GVK Energy

    NCLT Allows Bankruptcy Proceedings Against GVK Energy

    0
    By Aruna Sharma on May 12, 2025 ENERGY

    (Business Line)

    National Company Law Tribunal’s Hyderabad bench has permitted insolvency proceedings to be initiated against GVK Energy, following a petition filed by lender IDBI Bank.

    GVK Energy, a subsidiary of GVK Power & Infrastructure, was corporate guarantor for debt incurred by GVK Power for a thermal power project in the Punjab.

    As part of a consortium, IDBI had extended term loan of around ₹734 crore and working capital of ₹154 crore to GVK Power, which defaulted in repaying the loan and in 2018 the account was declared a non-performing asset.

    In 2022, another lender Axis Bank had initiated insolvency proceedings against the corporate debtor. Under a resolution plan IDBI received ₹306 crore against admitted claims of ₹1,413 crore. With the remaining ₹1,107 crore still pending, IDBI exercised its right to recover it from the guarantor, despite the resolution of main borrower.

    In its ruling the NCLT said that the default exceeded the minimum threshold of ₹1 crore and that the Insolvency and Bankruptcy Code provided for the initiation of bankruptcy proceedings against a corporate guarantor.

    The court dismissed the company’s claims that with GVK Power’s resolution plan going through the debt had been extinguished.

    NCLT named Venkata Chalam Varanasi as the interim resolution professional.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Western Coalfields Limited Recognised As Highest Taxpayer In Nagpur Region

    NTPC Renewable Energy Fully Commissions 220-MW Shajapur Solar project

    BHEL Bags Order Worth Rs 6500 Crore From Adani Power

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.