Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » CEA Concurs 6 Hydro-Pumped Storage Projects Of 7.5 GW In 2024-25

    CEA Concurs 6 Hydro-Pumped Storage Projects Of 7.5 GW In 2024-25

    0
    By Aruna Sharma on April 13, 2025 ENERGY

    (PIB)

    The Central Electricity Authority (CEA), under the Ministry of Power, Government of India, has concurred Detailed Project Reports (DPRs) of following 6 Hydro Pumped Storage Projects (PSPs) of about 7.5 GW in record time during 2024-25, marking a key milestone in India’s ongoing commitment to developing advanced long term energy storage solutions:

    • Upper Indravati (600 MW) in Odisha
    • Sharavathy (2,000 MW) in Karnataka
    • Bhivpuri (1,000 MW) in Maharashtra
    • Bhavali (1,500 MW) in Maharashtra
    • MP-30 (1,920 MW) in Madhya Pradesh
    • Chitravathi (500 MW) in Andhra Pradesh

    This is the outcome of the collaborative efforts of the PSP developers, appraising organisations (CWC, GSI and CSMRS).

    A number of steps were taken to resolve the issues and fast track the appraisal process.   This is a big achievement since inception of new concept of Off-Stream, close loop PSPs. CEA has made the appraisal process transparent through the Portal “Jalvi Store”. The DPR for appraisal has been made shorter, check list has been provided for ease of submission of chapters to appraising agency and many more such initiatives.

    Further, CEA has made ambitious plan to concur minimum 13 PSPs of about 22 GW during 2025-26. Most of these PSPs are targeted to be commissioned in 4 years and latest by 2030. Development of these projects shall boost energy storage capacity drastically in the country, making a major contribution to grid reliability and supporting India’s ambitious renewable energy goals. This further underscores the CEA’s ongoing commitment for facilitating the transition towards a more sustainable and resilient power system.

    The participation of private sector in this segment is quite encouraging and with the help of self-identified PSP, the PSP potential in the country has crossed 200 GW and it is further increasing almost every month. Thus, from a meagre 3.5 GW of operational hydro PSP capacity in the country, the development needs to be taken up in an accelerated mission mode to harness this potential. This year two PSPs around 3000 MW will get commissioned and by 2032 we expect around 50 GW. At present 8 projects of 10 GW is under construction and DPR has been concurred for 3 projects of around 3 GW. In addition to this, 49 projects of 66 GW are under Survey and investigation. All these DPRs are expected to be finalised by the developers in 2 years.

    Hydro PSPs are vital for the energy transition, as they allow excess electricity generated during off-peak hours to be stored in the form of water in elevated reservoirs. This stored energy can then be used back during non-solar hours peak demand periods, ensuring a reliable, consistent, and flexible power supply.

    For developers and investors, it is a great investment opportunity to develop and invest in a long term assets of more than 70- 80 years.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Western Coalfields Limited Recognised As Highest Taxpayer In Nagpur Region

    NTPC Renewable Energy Fully Commissions 220-MW Shajapur Solar project

    BHEL Bags Order Worth Rs 6500 Crore From Adani Power

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.