Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Cabinet Approves The Investment Proposal Of Ratle Hydro Power Project

    Cabinet Approves The Investment Proposal Of Ratle Hydro Power Project

    0
    By Aruna Sharma on January 21, 2021 ENERGY

    The Union Cabinet, chairs by the Prime Minister, Shri Narendra Modi gives its approval for the investment of Rs.5281.94 crore for 850 MW Ratle Hydro Electric (HE) Project locate on river Chenab, in Kishtwar district of Union Territory  of Jammu and Kashmir, by a new Joint Venture Company (JVC) to be incorporated between National Hydroelectric Power Corporation (NHPC) and Jammu & Kashmir State Power Development Corporation Ltd (JKSPDC) with equity contribution of 51% and 49% respectively.

    Salient Features

    Government of India is also supporting the Union Territory of Jammu and Kashmir by providing grant of Rs. 776.44 crore for Equity contribution of JKSPDC in the JVC to be set up for construction of Ratle HE Project (850 MW). NHPC shall invest its equity Rs.808.14 crore from its internal resources. The Ratle Hydro Electric Project shall be commissioned within a span of 60 months. The Power generated from the Project will help in providing balancing of Grid and will improve the power supply position.

    Implementation Strategy

    Government of Union Territory of Jammu and Kashmir, to make the Project viable, will extend exemption from levy of Water Usage Charges for 10 years after commissioning of the project, reimbursement of State’s share of GST (i.e. SGST) and waiver of free power to the Union Territory of Jammu and Kashmir in a decremental manner, i.e., the free power to the Union Territory of Jammu and Kashmir would be 1% in the 1st year after commissioning of the Project and rising @1% per year to 12% in the 12th year.

    Objectives

    The construction activities of the Project will result in direct and indirect employment to around 4000 persons and will contribute in overall socio-economic development of the Union Territory of Jammu and Kashmir. Further, Union Territory of Jammu and Kashmir will be benefitted by getting free power worth Rs. 5289 crore and through levy of Water Usage Charges worth Rs.9581 crore from Ratle Hydro Electric Project, during project life cycle of 40 years.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.