Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Government Deallocates Coal Block In Jharkhand Allotted For Power Project

    Government Deallocates Coal Block In Jharkhand Allotted For Power Project

    0
    By Aruna Sharma on January 2, 2020 ENERGY

    (PTI)

    The government has cancelled the allotment of a coal block for the power project in Jharkhand, as even after a decade of allotment no significant progress was made to operationalise it. The coal block was allotted in 2009, to Karanpura Energy Ltd — an SPV of erstwhile Jharkhand State Electricity Board (JSEB).

    “It is noted that even after lapse of 10 years since allocation of the coal block (Mourya coal block), no significant progress has been made to operationalise the coal block,” the coal ministry said in a letter to the company.Due to long delays in development of coal block, show cause notices were served by the coal ministry to the company in December 2013, and September and October, 2019.

    The company in its reply to the ministry in November, 2019 cited non-availability of land, water and resistance from the local inhabitants as impediments in development of the coal block.The coal ministry, however, said that the reply “was not found satisfactory”.As per the allocation letter, the ministry said, the mining lease of the block

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.