Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • SC To Hear Plea Against Vijay’s Visit To Karur Victims
    • ZEE5 Urges Fans To Avoid Piracy After Satluj Removal
    • Ali Fazal, Richa Chadha Reunite For Delhi Comedy
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Khabar India
    You are at:Home » ONGC Extends Deadline To Accept Bids For 64 Fields To January 3

    ONGC Extends Deadline To Accept Bids For 64 Fields To January 3

    0
    By Aruna Sharma on December 30, 2019 INTERNATIONAL

    (ET)

    Oil and Natural Gas Corp (ONGC) has extended until January 3 a deadline to accept bids from private players interested in operating its 64 small producing fields. The original deadline was December 20 for bids that were invited in June. ONGC has met several concerns raised by potential bidders in pre-bid meetings, although it has left some unaddressed. Contractors will now have more time to present performance bank guarantees and field development plans, and can offer lower performance guarantees than initially proposed, according to the amended tender documents.A contractor can now exit a field before three years by forfeiting the full performance bank guarantee.Initial provisions provided for an exit only after three years.

    ONGC, however, has not agreed to requests by some potential bidders to adjust the baseline production forecast in future. “Baseline production is estimated considering the historical decline rates and current field inputs. The same is duly vetted by third party of international repute,” ONGC said in its reply to pre-bid queries. “As per the terms of the contract, it is non-negotiable and the contractor is obligated to maintain the same during contract period.”

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    U.S. Strikes Iran After Hormuz Ship Attacks

    What To Expect From The 2026 NATO Summit In Turkey

    Ukraine Warns Of Missile Shortage After Deadly Kyiv Attack

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Rupee Ends Lower At 95.38 Against U.S. Dollar

    July 8, 2026

    U.S. Strikes Iran After Hormuz Ship Attacks

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    July 8, 2026

    Messi Inspires Argentina’s Stunning Comeback Against Egypt

    July 8, 2026

    Mbappé Slams Racist Remarks By Paraguayan Senator

    July 7, 2026

    Ronaldo’s World Cup Dream Ends

    Company
    Company
    Recent Posts
    • Messi Inspires Argentina’s Stunning Comeback Against Egypt
    • Rupee Ends Lower At 95.38 Against U.S. Dollar
    • U.S. Strikes Iran After Hormuz Ship Attacks
    • What To Expect From The 2026 NATO Summit In Turkey
    • Gadkari Defends E20 Fuel, Challenges Critics
    • Media Monitoring
    • National
    • ENTERTAINMENT
    • UP/STATES
    • BUSINESS
    • SPORTS
    • CRIME
    • INTERNATIONAL
    • EDUCATION
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.