Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Mangdechhu Hydroelectric Project To Start Producing By End Of Next Month

    Mangdechhu Hydroelectric Project To Start Producing By End Of Next Month

    0
    By Aruna Sharma on January 15, 2019 ENERGY

    (ET)

    After few episodes of minor delay, 720 Megawatt Mangdechhu Hydroelectric Project in Bhutan is likely to come alive by the end of February. India is a major stakeholder in the Rs 4000 crore worth green power project that is planned to supply mammoth amount of energy to India at a favorable price.

    Against the initial project planning for completion in 2017, the project was set to get commissioned in the month of June 2018. Following few minor technical complicacies, the commissioning was shifted first to October 2018, then November and then January 2019.

    But the January deadline also had to be abandoned. According to managing A. K. Misra, MD MHPA (Mangdecchu Hydroelectric Project Authority), more than 99% work is over. One of the main issues that caused the delay was a small crack in a floodgate that the authority did not want to ignore. “All the works are now likely to be over soon and all the four units of the project plant are expected to start producing with all its units by the end of February 2019,” said officials.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.