Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Prime Minister Welcomes Global Leaders to AI Impact Summit in Delhi
    • NHAI Accepts National Highways Infra Trust Offer To Acquire Two National Highway Assets
    • ONGC Reports A 1.6% Rise In Q3 Net Profit
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » BHEL Commissions 30 MW Hydro Unit In Mizoram

    BHEL Commissions 30 MW Hydro Unit In Mizoram

    0
    By Amit Bhanot on November 29, 2017 ENERGY, Media Monitoring

    Bharat Heavy Electricals Limited (BHEL) has successfully commissioned the second unit of the 2×30 MW Tuirial Hydro Electric Project (HEP) in the state of Mizoram. Significantly, the unit has been commissioned by BHEL in less than a hundred days of the commissioning of the first unit.

    Located in Kolasib district of Mizoram, the greenfield project of North Eastern Electric Power Corporation Limited (NEEPCO) has been set up on the river Tuirial. Power generation from Tuirial HEP will contribute significantly to reduction of greenhouse gas emissions and contribute towards achieving a low carbon development path for the nation.

    The order for Electrical & Mechanical (E&M) works for two units of 30 MW each was placed on BHEL by NEEPCO, for design, manufacture, supply, installation and commissioning of two 30 MW Vertical shaft Francis Turbines & matching Generators, Transformers and Switchyard. The equipment has been manufactured and supplied by BHEL’s units at Bhopal, Jhansi, Bengaluru, Rudrapur & Mumbai and the execution of work on site has been carried out by the company’s Power Sector Eastern Region.

    Notably, NEEPCO’s entire installed hydro capacity of 785 MW has been supplied & commissioned by BHEL. The other hydro project of NEEPCO currently under execution by BHEL is the 4×150 MW Kameng HEP in Arunachal Pradesh. Various other hydro projects of NEEPCO, commissioned by BHEL, include the 3×135 MW Ranganadi HEP in Arunachal Pradesh and the 4×50 MW Kopili HEP in Assam.

    BHEL has always been at the forefront in going to difficult terrains and setting up power projects. In the North Eastern states, BHEL has installed over 3,200 MW of power generating capacity, accounting for more than 75% of the total installed capacity in the region.

    BHEL is presently executing Hydro Electric Projects of around 3,100 MW in the country, in addition to 2,940 hydro projects in Bhutan. Significantly, more than 500 hydro electric power generation sets with a cumulative capacity of more than 29,000 MW of various ratings have been contracted on BHEL, including 5,700 MW for overseas projects. BHEL’s hydro plants are successfully and efficiently performing in India and across the world, including Afghanistan, Azerbaijan, Bhutan, Malaysia, Taiwan, Tajikistan, Rwanda, Thailand, New Zealand, Nepal and Vietnam.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    February 27, 2026

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    February 19, 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    February 16, 2026

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    August 6, 2025

    Hero MotoCorp Q1 Profit Surges 65% to ₹1,706 Crore on Ather Energy IPO Gains

    August 4, 2025

    Aurobindo Pharma Q1 FY26: Net Profit Falls 10% Despite Revenue Growth

    Company
    Company
    Recent Posts
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.