Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Reliance Pushes Back KG-D6 Production To September/October

    Reliance Pushes Back KG-D6 Production To September/October

    0
    By Aruna Sharma on June 29, 2020 PRIVATE SECTOR

    (PTI)

    Reliance Industries has pushed back the start of production from the second wave of discoveries in its eastern offshore KG-D6 block to September/October after the COVID-19 lockdown imposed unprecedented constraints in execution of the deepwater project. The company, along with its partner BP Plc of the UK, was initially targeting the start of production from the R-Series field in the Krishna Godavari block in May but pushed it back to June-end due to the lockdown.

    The lockdown has further pushed the start of production to mid of 2020-21 fiscal, Reliance said in its latest annual report. Fiscal year runs from April to March and mid of the fiscal should be September or October.
    In its annual report, Reliance said the key focus for 2019-20 was to monetise the about 3 trillion cubic feet equivalent of discovered resources in KG-D6 deepwater.

    “Concurrent development of three deep/ultra-deepwater projects in block KG-D6 namely, R-Cluster, Satellite Cluster and MJ fields, is being pursued by leveraging the existing world class hub infrastructure.
    “All contracts have been awarded and projects are in different stages of maturity with commissioning of the first of the three projects i.e. R Cluster, expected this year,” it said. Combined production from these three fields is expected to be 30 million standard cubic metres per day (mmscmd) by FY2024. The output is equal to a third of India’s current natural gas production. “Up until March 2020, all projects have been ahead of schedule. However, the outbreak of the COVID-19 pandemic and consequent lockdowns have presented unprecedented constraints in the execution of these deepwater projects.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.