Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Modi Inaugurates Delhi-Dehradun Expressway
    • पश्चिम यूपी के लिए गेमचेंजर होगा दिल्ली-बागपत-सहारनपुर-देहरादून इकोनॉमिक कॉरिडोर: सीएम योगी
    • Complete Automatic Closure System Installation At 1,228 Level Crossings: Railway Board
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Modi Lays Foundation Stone Of The Pakal Dul Power Project In Jammu & Kashmir

    Modi Lays Foundation Stone Of The Pakal Dul Power Project In Jammu & Kashmir

    0
    By Aruna Sharma on May 19, 2018 PMO

    Prime Minister Shri Narendra Modi inaugurated Kishanganga Hydroelectric Project and laid the Foundation Stone of the Pakal Dul Power Project in Jammu & Kashmir today. Pakal Dul, with 1000 MW capacity, will be the largest Hydro Power Project in Jammu & Kashmir on completion. It is also the first storage Project in Jammu & Kashmir.

    330 MW Kishanganga Hydro Electric Project, located in Bandipora District of Jammu and Kashmir (J&K) is a run of river scheme. All units of the project have been sychronised on 30.03.2018 and the annual generation of the main project is 1712.96 MU. The Project has been proposed to be completed at a cost of Rs. 5882 crore.

    Kishangana H.E. Project will provide a free power of 13 per cent to the state, which will be around Rs. 133 crore per year. There are other benefits to the state like- Employment to the people of J&K, infrastructure development etc. It is estimated that the project engaged about 1850 local persons during construction stage and 750 local persons during operation stage through direct and indirect employment. The Project was handed over to NHPC for execution by the State Government after an MoU was signed between J&K Govt. and Ministry of Power, Govt of India in July 2000.

    The project cost of Pakal Dul as per CCEA sanction is Rs. 8112.12 crore and it is supported by the Government of India as well as the Government of J&K. Timelines of implementation is 66 Monthsfrom the start of the Project. It shall be leading to additional Generation of 650 MU in downstream projects as it is a storage type project and shall improve the water availability during the lean season.

    Pakal Dul project will have immense benefits for J&K. Around 3000 persons shall be employed directly/ indirectly during construction phase of the project. Further, around 500 persons shall be employed directly/indirectly during operation phase of the Project. It has been agreed that the Govt. of J&K shall be getting 12 per cent free power after 10 years of commissioning of the Project and water usage charges as applicable. Additional 1 per cent free power will go towards Local Area Development Fund (LADF). Govt. of J&K has first right to purchase balance power of NHPC (49%) & PTC (2%). Furthermore, local population will be benefitted by the improvement and widening of roads and improvement of bridges under the Project.

    Shri R K Singh, Minister of State (IC) for Power and New & Renewable Energy, Government of India was also present at the occasion.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    April 16, 2026

    Expansion Of PNG Supply By GAIL (India) Limited In Varanasi

    April 14, 2026

    GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    • ONGC Refineries Purchase Russian Crude Oil When Economically Viable: Chairman
    • NDA ने भी सम्राट को चुना अपना ‘चौधरी’, बुधवार को लेंगे मुख्यमंत्री पद की शपथ
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.