Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Prime Minister Welcomes Global Leaders to AI Impact Summit in Delhi
    • NHAI Accepts National Highways Infra Trust Offer To Acquire Two National Highway Assets
    • ONGC Reports A 1.6% Rise In Q3 Net Profit
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » LPG Plant at Tiruvallur to Expand Production

    LPG Plant at Tiruvallur to Expand Production

    0
    By Aruna Sharma on September 21, 2017 Petroleum & Natural Gas

    (TH)

    Indian Oil Petronas Pvt Ltd. (IPPL) will expand its liquefied petroleum gas (LPG) production capacity to 23.04 lakh tonnes per annum at its Athipattu village plant in Tiruvallur district. This expansion will provide for increased availability of auto gas and domestic LPG to residents of Chennai.

    At present, the IPPL plant supplies 400 tonnes of LPG a day to the Indane bottling plant that is located adjacent to it. The IPPL import/export terminal was commissioned at Ennore in 2012 to increase LPG availability and eliminate transportation cost by bullet trucks. Butane and propane are received by ship in a refrigerated state at Ennore Port and transferred and stored at the terminal where they are blended and then transferred to loading stations for other bottling plants and the neighbouring Indane bottling plant, explained sources.

    The terminal has a capacity of 5.76 lakh tonnes per annum currently and operates on single shift. In the proposed expansion, the shifts would be increased to three and the plant would work 24 hours instead of the present eight hour shift. Four more loading, filling bays would be installed at a cost of ₹2 crore. This would be in addition to the 12 existing bays. The terminal can handle up to 12,00,000 tonnes per annum in case of future needs. It already has a massive parking area of 37,000 sq ft to accommodate 300 bullet trucks, cooling tower system, RO plant, boiler, fuel storage systems, sewage treatment plant and rainwater harvesting pond to support the process operations, the sources said.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    February 27, 2026

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    February 19, 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    February 16, 2026

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    August 6, 2025

    Hero MotoCorp Q1 Profit Surges 65% to ₹1,706 Crore on Ather Energy IPO Gains

    August 4, 2025

    Aurobindo Pharma Q1 FY26: Net Profit Falls 10% Despite Revenue Growth

    Company
    Company
    Recent Posts
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.