Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra
    • यूपी: प्रदेश को भीषण गर्मी से मिली राहत
    • India Meets A Record 256 GW Peak Power Demand Without Shortages
    • Sandeep Poundrik Inaugurated Skill Development Courses For Secondary Steel Sector
    • Dharmendra Pradhan Reviews Availability And Timely Distribution Of NCERT Textbooks
    • Taneira Unveils A Refreshed Summer Wardrobe In Lucknow
    • Expansion Of PNG Supply By GAIL (India) Limited In Varanasi
    • GAIL To Invest Rs 3,800 Crore In 700 MW Solar Projects In UP, Maharashtra
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » RBI Provides Banks First List of 6 Stressed Accounts

    RBI Provides Banks First List of 6 Stressed Accounts

    0
    By Aruna Sharma on June 16, 2017 Infra

    (FE)

    Bankers have received from the Reserve Bank of India (RBI) the first list of six stressed accounts that they must resolve via the Insolvency and Bankruptcy Code (IBC), senior executives familiar with the development said. The bankers added that the central bank had asked them to refer the cases to the National Company Law Tribunal (NCLT) within a fortnight. The companies, with a combined debt of Rs 1.6 lakh crore, include Essar Steel, Bhushan Steel, Bhushan Power & Steel, Monnet Ispat, Alok Industries and Electrosteel Steels. On Tuesday, the RBI said it had identified 12 stressed accounts that would need to be resolved via the IBC. These are accounts to which lenders have an exposure of more than Rs 5,000 crore and more than 60% of which have been recognised as NPAs. While lenders with exposure to these NPAs have been asked to resolve them using the IBC, they could also explore other methods of resolution, sources said. Bankers are expecting the names of six more near-bankrupt companies soon. “There is no time or no space for inaction. We have been given 15 days to act,” one of the bankers said.

    With a gross debt of Rs 44,477.93 crore as on March 31, 2016, Bhushan Steel is probably the single largest toxic exposure that banks have on their books. The Essar Steel account too is fairly large, with lenders having disbursed some Rs 37,284 crore. Bhushan Power & Steel, which owes banks around Rs 37,248.26 crore, is another account that is in trouble. Lenders have a slightly smaller exposure to Alok Industries (Rs 22,075.15 crore), Monnet Ispat and Energy (Rs 12,115 crore) and Electrosteel Steels (Rs 10,273.59 crore). Once these cases are referred to IBC, the lenders to these companies would need to set up a committee that will come up with a plan for resolution. If that cannot be done in a period of 180 days — this can be extended to 270 days — the borrowing entity will go into liquidation.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra

    यूपी: प्रदेश को भीषण गर्मी से मिली राहत

    India Meets A Record 256 GW Peak Power Demand Without Shortages

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    April 28, 2026

    Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra

    April 28, 2026

    यूपी: प्रदेश को भीषण गर्मी से मिली राहत

    April 28, 2026

    India Meets A Record 256 GW Peak Power Demand Without Shortages

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    April 23, 2026

    Taneira Unveils A Refreshed Summer Wardrobe In Lucknow

    March 12, 2026

    TVS Orbiter V1 launched; Now Available From ₹49,999 with BaaS

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    Company
    Company
    Recent Posts
    • Modi Flags Off Two Amrit Bharat Trains Between Uttar Pradesh And Maharashtra
    • यूपी: प्रदेश को भीषण गर्मी से मिली राहत
    • India Meets A Record 256 GW Peak Power Demand Without Shortages
    • Sandeep Poundrik Inaugurated Skill Development Courses For Secondary Steel Sector
    • Dharmendra Pradhan Reviews Availability And Timely Distribution Of NCERT Textbooks
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.