Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Prime Minister Welcomes Global Leaders to AI Impact Summit in Delhi
    • NHAI Accepts National Highways Infra Trust Offer To Acquire Two National Highway Assets
    • ONGC Reports A 1.6% Rise In Q3 Net Profit
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » BHEL Commissions One More Unit Of Kaleshwaram Lift Irrigation Scheme Package

    BHEL Commissions One More Unit Of Kaleshwaram Lift Irrigation Scheme Package

    0
    By Aruna Sharma on August 5, 2019 ENERGY, Media Monitoring

    Bharat Heavy Electricals Limited (BHEL) has successfully commissioned one more pumping unit (Unit 5) of 116 MW of the 7×116 MW Kaleshwaram Lift Irrigation Scheme (LIS) Package-6 in Telangana. BHEL has earlier commissioned 4 Units of the same project in April and May, 2019. Significantly, the pump for each unit is designed to lift 89.16 cumecs (cubic metres per second) of water by 105.5 metres.

    Being developed by the Irrigation & CAD (I&CAD) department of the Government of Telangana, the greenfield lift irrigation project (formerly known as Pranhita Chevella) is located in Peddapalli district of Telangana. In the project, water shall be lifted from Sripada Yellampalli reservoir to Medaram reservoir and will be used for irrigation and water supply in nearby areas, thereby contributing to the overall development of the area and the state of Telangana.

    BHEL’s scope in the project comprises complete Electrical & Mechanical (E&M) works including design, manufacture, supply and supervision of erection and commissioning of 7 sets of Vertical Pump-Motor sets along with associated auxiliaries. The equipment has been supplied from BHEL’s manufacturing units at Bhopal, Rudrapur and Bengaluru, while the supervision of erection and commissioning at the site was carried out by the company’s Power Sector Southern Region division, Chennai.

    In Telangana, BHEL has so far commissioned 30 Pump-Motor sets of various ratings cumulatively aggregating to 1,101 MW. In addition, BHEL is presently executing another 35 Pump-Motor sets totaling to 4,777 MW for various Lift Irrigation Schemes in Telangana, viz. Kaleshwaram LIS Package 6,8,10 & 11 and Palamuru Rangareddy LIS Package 5 & 8. In addition to Lift Irrigation projects, BHEL has made significant contribution to the hydro sector of Telangana and has commissioned 1,073 MW of hydro power projects in the state so far.

    BHEL is presently executing Hydro-electric Projects of more than 2,900 MW across the country, in addition to 3,544 MW abroad which includes 2,580 MW in Bhutan and 900 MW in Nepal. Significantly, more than 500 hydro-electric generating sets of various ratings have been ordered on BHEL with a cumulative capacity of more than 30,000 MW, including 6,680 MW for overseas projects. BHEL’s hydro plants are successfully performing in India and across the world, including countries such as Afghanistan, Azerbaijan, Bhutan, Malaysia, Taiwan, Tajikistan, Rwanda, Thailand, New Zealand, Nepal and Vietnam.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Aruna Sharma

    Related Posts

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    February 27, 2026

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    February 19, 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    February 16, 2026

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    August 6, 2025

    Hero MotoCorp Q1 Profit Surges 65% to ₹1,706 Crore on Ather Energy IPO Gains

    August 4, 2025

    Aurobindo Pharma Q1 FY26: Net Profit Falls 10% Despite Revenue Growth

    Company
    Company
    Recent Posts
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.