(PTI)
The long-awaited trial of the second rake of Train 18 would be done on the Delhi-Katra route likely by next month, according to a railways document. The train, which has been in Delhi for around a month, has been manufactured by the Integral Coach Factory, Chennai. According to plans, on its trial run, the train will depart from New Delhi at 6 am, reach Ambala at 8 am where it will halt for two minutes before leaving for Ludhiana where it will reach at 9.22 am. After a two-minute halt at the Ludhiana station, it would then make way for Jammu Tawi and reach at 12.20 pm and before eventually terminating at Katra station at 2 pm, the train will pass through Sanehwal station without stopping.