Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Prime Minister Welcomes Global Leaders to AI Impact Summit in Delhi
    • NHAI Accepts National Highways Infra Trust Offer To Acquire Two National Highway Assets
    • ONGC Reports A 1.6% Rise In Q3 Net Profit
    Facebook X (Twitter) YouTube
    Khabar India
    Khabar India Banner
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Khabar India
    You are at:Home » Steps To Ensure Coal Supply To Power Plants

    Steps To Ensure Coal Supply To Power Plants

    0
    By Amit Bhanot on December 14, 2021 ENERGY

    (P.I.B)

    Coal companies supply coal to its linked Central/State Gencos under long term bi-lateral Fuel Supply Agreements (FSAs) and as per terms and conditions of these FSAs.

    Due to increased demand of power, less power generation by imported coal based power plants and some interruption in supply of coal due to heavy rains, the coal stock at the power plants depleted to 7.2 MT (sufficient for 4 days) as on 8th October, 2021. Subsequently with increased coal supplies, the coal stock has started increasing and has now reached 18.5 MT (sufficient for 10 days) as on 05.12.2021.

    The overall power supply position in the country is comfortable with only a marginal gap of about 0.5% between energy requirement and energy supplied. Even this marginal gap is generally on account of factors, other than inadequacy of power in the country for the following reasons, i.e. constraints in distribution network, financial constraints, commercial reasons, outage of generating units, etc.

    In order to meet the expected increase in power demand several power projects have been planned and are in various stages of construction. Hydro projects totaling to about 12663.5 Mega Watt (MW), thermal projects totaling to about 31665 MW and nuclear capacity of about 8700 MW are under various stages of construction. Further, Govt. of India has also set a target of 175 Giga Watt (GW) Renewable Energy (RE) installed capacity by 2022.

    The government has taken the following measures for increase the coal supply:-

    i.  In order to address the issues of coal supplies to power sector, an Inter-Ministerial Sub-Group comprising of representatives from Ministry of Power, Ministry of Coal, Ministry of Railways, Central Electricity Authority (CEA), CIL and Singareni Collieries Company Limited (SCCL) meet regularly to take various operational decisions to enhance supply of coal to thermal power plants as well as for meeting any contingent situations relating to power sector including critical coal stock position in power plants.

    ii. CIL had offered about 5.2 MT of additional coal from its various subsidiaries to States, Central Gencos for lifting through RCR/ Road Mode

    iii. In addition to Annual Contracted Quantity (ACQ), coal has been offered under RCR mode on ‘as is where basis’ to build up stock at Power house end.

    iv. The Ministry of Coal has amended Mineral Concession Rules, 1960 with a view to encourage domestic coal production enhancement from captive mines by allowing sale of coal or lignite, on payment of additional amount, by the lessee of a captive mine up to 50 percent of the total coal or lignite produced in a financial year, after meeting the requirement of the end use plant linked with the mine. Earlier this year, the Mines and Minerals (Development &Regulation) Act had been amended to this effect. This is applicable for both the private and public sector captive mines. With this amendment, the Government has paved the way for releasing of additional coal in the market by greater utilization of mining capacities of captive coal and lignite blocks,which were being only partly utilized owing to limited production of coal for meeting their captive needs.

    This information was given by the Union Minister of Coal, Mines and Parliamentary Affairs Shri Pralhad Joshi in a written reply in Rajya Sabha today.

     

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amit Bhanot

    Related Posts

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    • Facebook 99K
    • Twitter 1.5K
    • YouTube 370
    • Popular
    • Video
    • Pvt Sector
    February 27, 2026

    Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026

    February 19, 2026

    PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU

    February 16, 2026

    AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh

    July 23, 2025

    PM Narendra Modi Interacts With Media On The First Day Of Monsoon Session Of Parliament

    February 11, 2025

    Prime Minister Narendra Modi Gets A Rousing Welcome By Indian Community In Paris, France

    February 11, 2025

    Prime Minister Narendra Modi Attends Dinner Hosted By French President In Paris

    August 8, 2025

    Racing Towards Glory: Odisha Hosts the World Athletics Continental Tour Bronze

    August 6, 2025

    Hero MotoCorp Q1 Profit Surges 65% to ₹1,706 Crore on Ather Energy IPO Gains

    August 4, 2025

    Aurobindo Pharma Q1 FY26: Net Profit Falls 10% Despite Revenue Growth

    Company
    Company
    Recent Posts
    • Indian Institute of Technology Ropar Showcases Leadership Across Four Key Sessions at India AI Impact Summit 2026
    • PM Announces India–France National Centre of Excellence in Aviation at Kanpur under PM-SETU
    • AM Group Commences Development of Gigawatt Scale AI Compute Hub in Uttar Pradesh
    • From Boardrooms to Boundaries: Teams Light Up the Cricket Field
    • Raksha Mantri Inaugurates Missile Integration Facility At BEL
    • Media Monitoring
    • National
    • BIHAR ELECTION
    • UP and States
    • Petroleum & Natural Gas
    • Private Sector
    • Infra
    • PSU
    • SKILL DEV./ CSR
    Copyright © 2017 khabarindia.in. About / Privacy Policy / Terms and Condition / Contact Us

    Type above and press Enter to search. Press Esc to cancel.