Operation At Oil Well In Assam Suspended Due To Heavy Rainfall

0

(ET)

Ongoing operation at oil well No 5 of Baghjan in Assam’s Tinsukia was suspended after floodwater inundated the area following heavy rainfall. “Dangori River is overflowing. All connecting roads to the site are submerged with flood water. Bridge on Doomdooma-Baghjan Road is broken, while Plastic Park Road is closed by District Authority for vehicles for flood water. Flood water has entered Debris area, Kill Pump area and CMT Water Pump area making the areas unsafe for carrying out operations,” Oil India Limited said in a statement.

All connecting roads to the well site have been badly hit by flood. The approach road via Talap-Daisajan-Kordoiguri-Badarkhati-Baghjan which was being repaired along with APWD is also affected by flood water in number of places. A recce is underway for exploring approach road to the well site, said OIL.

Debris removal work for the main capping operation at site couldn’t be carried out since the main road to site is closed by District Authority due to flood. Fire service personnel are stationed at strategic locations for handling any emergency.

Share.

About Author

Twitter Auto Publish Powered By : XYZScripts.com